Gone are the days when installing a PV system was as simple as “putting up a few panels and connecting an inverter.” To maximize power generation and ensure safety, you need MLPE (Module-Level Power Electronics) components—especially PV optimizers and Rapid Shutdown Devices (RSD). These are like the “left and right guardians” of modern PV systems. Whether you have a residential rooftop or an industrial power plant, without them, you’ll either miss out on potential power generation or compromise safety. Today, let’s break down just how important these two components are.
The most frustrating issue with modern PV systems is shading: Your rooftop might have an outdoor AC unit, or there could be a utility pole in the distance. Industrial power plants span large areas, making shading from trees or equipment unavoidable. In a standard PV system, if one panel is shaded, the entire string’s efficiency drops—leading to a 20%–30% reduction in power generation.
Fonrich’s PV optimizer is designed specifically to fix this. It gives independent control to each panel: Even if one panel is shaded, the others keep generating power at full capacity. What’s more, Fonrich’s optimizer is intelligent—it monitors real-time power generation data for each panel. Open the mobile app, and you can see details like, “Panel X generated 3 kWh today” or “Panel Y is running a bit hot.” You’ll know exactly which panel has an issue, no need to climb onto the rooftop and guess.
.jpg)
Before installing PV systems, people rarely thought about “power-off safety”—that changed when regulations were introduced in many regions. For example, in emergencies (fires, maintenance), PV system voltage must drop to below 30V within seconds; otherwise, grid connection is prohibited. This is where RSD comes in—especially module-level RSD, which is far safer than standard string-level RSD.
String-level RSD: Shuts down an entire string. For instance, if 10 of your panels are strung together, repairing 1 panel means shutting down all 10. This not only disrupts power generation but also leaves other panels energized at high voltage—posing great risks to technicians during maintenance.
Module-level RSD: Shuts down only the faulty panel. The voltage of all other panels drops to a safe level instantly. It’s both safe and doesn’t interrupt overall power generation.
Don’t underestimate their importance—without them, you’ll face far bigger troubles:
If your rooftop has shading and you don’t install an optimizer, the money lost from reduced power generation in a year may even exceed the cost of the optimizer. Take a 10kW PV system as an example: Without an optimizer, it generates 12,000 kWh annually. With an optimizer, generation increases by 15% (an extra 1,800 kWh). At a rate of 0.5 yuan per kWh, you earn an additional 900 yuan per year—recouping the optimizer’s cost in 3–4 years. In the long run, it’s extremely valuable.
For today’s industrial power plants and BIPV projects (which have large scales and complex shading), optimizers are essential to guarantee power generation—without them, clients won’t approve your project.
Regulations now mandate RSD in most regions—PV projects without RSD will fail inspections and be denied grid connection. Even if you install the system secretly, safety accidents during maintenance or fires will result in losses far greater than the cost of RSD. A small factory once skipped installing RSD: When a PV fire broke out, power couldn’t be cut off quickly. Not only were the PV components destroyed, but the factory itself was damaged—leading to huge financial losses. This is a costly lesson in skipping RSD.
Don’t blindly chase “high specs”—choose what fits your needs:
Choosing an optimizer: Prioritize “power generation improvement in shaded scenarios” (e.g., whether it adapts to “seasonal shading differences” in summer and winter) and compatibility with your inverter.
Choosing RSD: Focus on “shutdown speed” (preferably within 30 seconds) and “protection rating” (at least IP65 to resist rainwater). Prioritize module-level RSD.
Whether you’re just planning to install a PV system or retrofitting an old one, these two MLPE components are a must. Don’t cut costs here—avoiding future troubles and earning more from increased power generation will far outweigh the initial investment. Isn’t that right?