How can we help?

Home » News old » Technical Support » What circumstances need to replace the Main Control Module

What circumstances need to replace the Main Control Module

(1)   The Main Controller Module has a black screen. When the multimeter measures a DC voltage between PV + and PV-> 400v, the Main Control Module needs to be replaced.

(2)   The data of the combiner box cannot be viewed in the background, and the settings (baud rate, parity, address) of the monitoring module are correct.

(3)   Remove the RS485 communication cable of the AB terminal of the controller module and measure the DC voltage between the AB terminals is less than 2v, you need to replace the Main Control Module


Installers

Products

Support

Fonrich

Please fill out the form below and we will get back to you as soon as possible.
Copyright  2021 Fonrich (Shanghai) New Energy Technology Co., Ltd. All rights reserved.            沪ICP备18039308号-1