Key Features
1. PV module rapid shutdown meeting NEC 2017 & 2020 (690.12) requirements
2. Rapid shutdown: Triggered within 30 seconds after the monitor loses power or the control switch manually turn off.
3. Module level data monitoring: 5 big datum including voltage, current, power generation, power generation operating point, temperature five big data, and in the way of snapshot collection
4. String break protection: active protection, all the PV module safety devices went into shutdown state within 5 secondsBidirectional PLC communication
1. PV module rapid shutdown meeting NEC 2017 & 2020 (690.12) requirements
2. Rapid shutdown: Triggered within 30 seconds after the monitor loses power or the control switch manually turn off.
3. Module level data monitoring: 5 big datum including voltage, current, power generation, power generation operating point, temperature five big data, and in the way of snapshot collection
4. String break protection: active protection, all the PV module safety devices went into shutdown state within 5 secondsBidirectional PLC communication
-
Series TT
B2B does not have purchase function
Inquire
B2B does not add shopping cart function
Related Products
No content
Get Touch With Us
Contact Info
+86-021-6071-7303
Service@mail.com
+66-9233-04370
No. 101, Building 2, Mingpu Plaza, No. 3279 Sanlu Highway, Minhang District, Shanghai