CHN Energy Ningxia 3MW PV Module-Level Rapid Shutdown Project

此图片的 alt 属性为空;文件名为 ningxiaguoneng-1024x576.webp

The CHN Energy Ningxia project utilizes ground-mounted racks for the installation of PV modules, with a total installation capacity of 3MWp and 7,488 modules installed. Construction began in December 2022 and was completed in May 2023. The project successfully achieved photovoltaic data collection and transmission to the SCADA software.