Home » News old » Projects » Case Sharing, Module-level Monitoring Data Analysis of STATE GRID Corporation of China PV Power Station

Case Sharing, Module-level Monitoring Data Analysis of STATE GRID Corporation of China PV Power Station

Inquire

    In the operation and maintenance of PV power plants, low power generation efficiency and large power loss have always been a headache for operation and maintenance personnel. Low power generation efficiency may be caused by various factors, such as component abnormality, component occlusion, module accumulation, and MPPT failure. Conventional operation and maintenance cannot effectively solve such problems. Located in the 20MWp agricultural and photovoltaic complementary PV power station of State Power Investment Corporation in Jiande City, Zhejiang Province, the reason for the low photovoltaic power generation has been preliminarily analyzed by using Fonrich's module IoT and safety protection scheme for 2 months. The following is a detailed data demonstration.

    

1.Power generation analysis

Total power generation: 1762.27kWh

Total lost power generation: 174.54kWh

Percentage of total power lost: 9.9%

640 (1)

640 (2)


Date
Power Generation (kWh) Total Loss (kWh) Loss Percentage
2021/11/24 80.5162 5.6159 6.97
2021/11/25 114.3602 9.7766 8.55
2021/11/26 117.7779 9.7854 8.31
2021/11/27 79.7865 7.7391 9.70
2021/11/28 46.0023 3.3145 7.21
2021/11/29 26.5772 2.7861 10.48
2021/11/30 83.9544 8.2659 9.85
2021/12/1 120.5157 14.3987 11.95
2021/12/2 115.2152 13.5085 11.72
2021/12/3 117.3081 13.9122 11.86
2021/12/4 110.7681 12.0415 10.87
2021/12/5 110.6371 12.8249 11.59
2021/12/6 112.7549 11.3614 10.08
2021/12/7 97.4537 8.0278 8.24
2021/12/8 75.9412 7.635 10.05
2021/12/9 71.5402 6.6965 9.36
2021/12/10 92.9073 8.5614 9.21
2021/12/11 71.634 4.6404 6.48
2021/12/12 2.9986 1.4 46.69
2021/12/13 27.785 3.4648 12.47
2021/12/14 11.2647 3.1612 28.06
2021/12/15 74.571 5.6185 7.53
Total 1762.2695 174.5363 9.9


The average daily power generation loss is about 10%, which is significantly higher than the loss ratio of ordinary photovoltaic power stations


2.Loss Type Analysis

图片4


Loss Type Lost Electricity Generation (kWh) Lost Percentage
Component exception 13.22 0.75
Component Shadow 130.52 7.41
Inverter MPPT 29.92 1.70
Component dust accumulation 0.88 0.04
Total 174.54 9.90

    Through data analysis, it is found that the power station has a small proportion of losses due to dust accumulation, but a large proportion of component shadows and inverter MPPT failures. It can be concluded that the operation and maintenance personnel of this power station are very attentive and clean the power station in a timely manner, but the problems of component shadowing and inverter MPPT failure cannot be solved through routine operation and maintenance.



3.Module abnormal loss analysis

    Abnormal moudule will cause series loss in the string. If the inverter MPPT is input by multiple channels in parallel, it will lead to mismatch loss between strings and parallels. The following figure shows the thermal diagram of abnormal loss of modules. The darker the color of the module, the more serious the abnormal loss. If the abnormal loss ratio of the module exceeds 10%, it is recommended to replace the module to improve the overall power generation.

640 (4)

Module abnormal loss heat map

640 (5)

4.Module shadow loss analysis 

    Shaded components will cause series loss in the string. If the inverter MPPT is input by multiple channels in parallel, it will lead to mismatch loss between strings and parallels. The darker the color of the module, the more serious the abnormal loss, and the shadow loss ratio of the module exceeds 10%. It is recommended to solve the shadow problem and improve the overall power generation. 

640 (6)

Component shadow loss heatmap

640 (7)


5.Inverter MPPT loss analysis

    MPPT loss caused by parallel mismatch between strings; inverter power reduction operation will cause MPPT loss; inverter aging and sampling distortion will cause MPPT loss; inverter MPPT loss will affect the overall power generation of the power station! When the inverter MPPT loss percentage is greater than 4%, it is recommended to replace the inverter.

640 (8)


String Lost power generation (kWh) Loss percentage
1 7.21 0.41
2 5.91 0.34
3 6.42 0.36
4 4.37 0.25
5 6.01 0.34
Total 29.92 1.70

Inverter MPPT loss ratio



6.Module soiling loss analysis

The soiling of the module will affect the overall power generation. It is recommended that the module should be cleaned when the soiling loss ratio of the module is greater than 4%.

640 (9)

Module soiling loss heat map

640 (10)


7.The benefits of module IoT and security protection


Module-level data reports, quickly locate faulty modules, increase power generation, and improve operation and maintenance efficiency

Fonrich Safety Photovoltaic-Data Report, which analyzes in detail the power loss of abnormal moudules, shadow modules, soiling modules and inverter MPPT, and locates the position of modules, which greatly improves the efficiency of operation and maintenance. After targeted adjustment After that, the power generation capacity of the power station can be increased.

The low-voltage modules are automatically turned off to protect the modules and increase the power generation of the string

When there is an abnormality or shadow in the module, the voltage of the module drops, and the end module will actively shut down the output of the module, eliminating the impact of the abnormality and shadow on the string, protecting the module and improving the power generation of the string.

A variety of shutdown methods to escort the safety of the power station


Manual shutdown:

  • During rescue, the main control is manually turned off, and the module voltage drops to 0V within 30S

  • Through the main control fixed-point shutdown of the problem modules, quickly solve the failure of power generation

Automatic shutdown:

  • The monitor is powered down

  • String break

  • Overtemperature

  • Arc fault accident


Various fault detection to solve the pain points of power station operation and maintenance

Arc Detection:

  • Parallel arc

  • Series arc

  • Arc fault location


8.System diagram


图片1

System solutions

Name Quantity Function
①Safety Controller 22*5string=110 Shutdown, monitoring, arc protection
②Smart Transceiver 5 PLC transceiver, 485 communication
③Collection box 5 Local display, shutdown protection, data upload
④Cloud server
Analyze, manage plant data
⑤Fonrich PV Management System
Display and manage power station data




RSD
Copyright © 2022 Fonrich (Shanghai) New Energy Technology Co., Ltd. All rights reserved. 沪ICP备18039308号-1